Upgradation of waste management system.
As Cyberpark expands its operations and footprint, the volume of waste generated daily is projected to triple. To maintain environmental compliance, uphold sustainability goals, and ensure a clean tech-hub ecosystem, the existing waste management infrastructure requires an immediate capacity upgrade and the implementation of a rigorous waste segregation protocol.
Existing Capacity: 100 kg / day
Additional Capacity Required: 200 kg / day
Total Target Capacity: 300 kg / day
Construction of Bus bay
As part of our ongoing commitment to enhancing campus infrastructure and ensuring employee convenience, Cyberpark has initiated the construction of a dedicated Bus Bay. Located at the primary entrance area of the campus adjacent to National Highway 66 (NH 66), this transit zone is being developed to accommodate the growing daily footfall of tech professionals and visitors.
Once completed, the bus bay will function as a safe, sheltered waiting space primarily for employees hailing cab services, company shuttles, and other vehicles. This initiative is expected to streamline traffic flow at the campus entry point, enhance pedestrian safety, and provide a seamless commuting experience for the entire Cyberpark community.
Upcoming Own Project
Cyberpark 2nd IT Building
- Built-up Area: 4 Lakh Sq. Ft.
- Location: Strategically located within the Cyberpark Campus.
- Infrastructure: Designed with modern IT infrastructure.
- Flexibility: Scalable floor layouts tailored for mid to large enterprises.
Upcoming Co-Developer Projects
Hilite Cyber Tower
- Scale: Approximately 9 Lakh Sq. Ft. built-up area.
- Configuration: 5 basements + Ground + 22 office floors.
- Layout: Typical floor plate spans 26,000 Sq. Ft.

Hilite Cyber Hub
- Scale: Total built-up area of 1.6 lakh Sq. Ft.
- Configuration: Basements + LG + Ground + 2 office floors.
Calinova Datacenter
- Capacity: 75,000 Sq. Ft. vertical campus spread across 8 floors.
- Sustainability: 8-floor LEED-certified facility featuring future-ready technology.
- Power & Capability: 5 MVA capacity with 2.4 MW IT load designed for AI and hyperscale operations.
Calinova